Products
225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids
  • 225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids
  • 225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids
  • 225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids

225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids

225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids - delivered without a PCS, for integrators and EPCs who pair it with their own inverter and EMS. 1P224S or 1P240S string, 150A standard current, CAN/Ethernet/RS485 handover, IP54 in a 2050kg cabinet.

A Battery Cluster Is Not a Storage System

This 225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids ships with no inverter inside. No EMS screen, no grid terminals - it is the DC-side battery cluster, and that absence is exactly why integrators buy it.

A system integrator or EPC often has a preferred PCS brand, a plant-wide EMS, or a container project where the power conversion stage is already contracted. Buying a battery with a built-in inverter means buying a second converter you cannot use, and paying for integration work the factory already did.

The 225kWh and 241kWh clusters present a clean DC interface over CAN, Ethernet or RS485, letting you attach the storage asset to your own power conversion and control stack. You keep the architecture; we supply the energy.

The Two Configurations and What They Match

225kWh at 1P224S with a 716.8VDC nominal and a 604~806VDC operating window; 241kWh at 1P240S with 768VDC nominal and 672~864VDC.

Both use LFP 3.2V/314Ah cells in 51.2V/314Ah packs - 14 packs for the 225kWh cluster, 15 for the 241kWh - and both rate 150A standard current at 0.5CP.

The 604~806VDC window suits PCS platforms built around a 600-800V DC bus; the 672~864VDC window suits the 750-900V class - match before you quote the project.

Maximum efficiency is 88% at 0.5C over one charge and one discharge, auxiliaries included, so your round-trip model uses a real system number.

Cycle life is stated at more than 8000 times at 0.5C and 25°C with at least 80% energy retention - the number your payback model needs, with its conditions attached.

Intelligent air-cooled air conditioning, aerosol plus perfluorohexanone fire protection, IP54, and 2050kg in a 1095*1210*2120mm cabinet on both variants.

225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids225kWh / 241kWh Modular Battery Energy Storage System for Commercial Microgrids

Technical Specifications

Category

Parameter

225kWh Model

241kWh Model

DC Side

Rated capacity

225kWh

241kWh

Cell type

LFP 3.2V/314Ah

LFP 3.2V/314Ah

Battery system string

1P224S

1P240S

PACK specification

51.2V314Ah

51.2V314Ah

NO. of PACKs

14 PCS

15 PCS

Nominal voltage

716.8VDC

768VDC

Voltage range

604~806VDC

672~864VDC

Standard charge/discharge current

150A

150A

System parameters

System efficiency

MAX.efficiency 88% @0.5C / 1 Charge 1 Discharge

MAX.efficiency 88% @0.5C / 1 Charge 1 Discharge

System lifespan

>8000Times (0.5C@25°C) Energy retention rate ≥ 80%

>8000Times (0.5C@25°C) Energy retention rate ≥ 80%

Wiring method

DC bottom entry

DC bottom entry

Charge & discharge rate

0.5CP

0.5CP

Thermal management method

Intelligent air-cooled air conditioner

Intelligent air-cooled air conditioner

Communication protocol

CAN/Eth/RS485(4G Optional)

CAN/Eth/RS485(4G Optional)

Fire protection system

Aerosol & Perfluorohexanone

Aerosol & Perfluorohexanone

IP rating

IP54

IP54

Product size

1095*1210*2120mm

1095*1210*2120mm

Product weight

2050kg

2050kg

Environmental Requirements

Operating temperature range

0°C~+50°C

0°C~+50°C

Operating humidity range

0~95%RH(No condensation)

0~95%RH(No condensation)

Operating altitude

2000m (>2000m Derating)

2000m (>2000m Derating)

Certification

PACK: CE ROHS Equipment: UN38.3 MSDS

PACK: CE ROHS Equipment: UN38.3 MSDS

Warranty

5 Years

5 Years

Who Buys a Bare Cluster

Integrators with an existing PCS line: the cluster adds storage to their catalogue without a second inverter SKU to stock and support.

EPCs standardising one battery partner across several sites - same 2050kg cabinet, same comms interface, same spare-parts list everywhere.

Projects converting PV plants to DC-coupled storage, where the cluster sits on the existing inverter's DC bus and the old inverter keeps its role.

Container projects where the PCS is separately procured by the client and the battery must arrive as a factory-tested, independently certified unit.

Backup builds for mining and industrial sites where the control architecture is proprietary and only a DC component will slot into it.

Matching and Stacking with Your PCS

The first check is voltage. The cluster's operating window - 604~806VDC or 672~864VDC depending on model - must sit inside the PCS DC input range with margin at both ends, because the battery rides the full window between empty and full charge.

The second check is the handshake. The cluster speaks CAN, Ethernet and RS485 as standard with 4G optional for remote service; your EMS either speaks one of those or gains a protocol gateway. We publish the register map with the documentation pack so your control engineer can map SOC, current limits and protection alarms without a factory call.

Capacity grows by adding clusters, not by re-racking. A second 241kWh cluster of the same model connects to the same DC bus in parallel - matched nominal voltage is the condition - and the site EMS aggregates them as two DC sources. Power stays limited by the PCS; energy scales in 225 or 241kWh steps.

The Safety and Certification File

Fire protection is two-stage: aerosol at pack level, perfluorohexanone for the cabinet volume - the configuration insurers now expect on commercial batteries.

PACKs carry CE and RoHS; the equipment ships with UN38.3 and MSDS, which is the documentation customs and site insurers ask to see.

IP54 enclosure with DC bottom entry, separating the electrical gland area from the pack compartment inside the cabinet.

Intelligent air-cooled air conditioning keeps the 14-15 packs in a tight temperature band; the controller modulates the fans against cell temperature.

The operating envelope is 0°C to +50°C, 0-95%RH without condensation, 2000m altitude with derating above - confirm your site is inside it before signing.

Every cluster completes a full 0.5CP factory cycling test with pack-level logging, and the acceptance report ships with the unit.

How the Cluster Is Assembled in Yueqing

1. Cell intake — 314Ah LFP cells are sampled for capacity and internal resistance before the build starts.

2. Pack assembly — 51.2V/314Ah packs are welded, wired and fitted with pack BMS, then insulation-tested.

3. Cabinet fabrication — sheet steel is CNC-cut, bent, welded and powder-coated with corrosion protection.

4. Racking — packs are installed in the 1P224S or 1P240S string with the DC bus torqued and checked.

5. Thermal and fire fit-out — air conditioner, ducting, aerosol generators and perfluorohexanone system installed and tested.

6. Control wiring — the cluster controller, comms gateways and DC bottom entry gland are terminated and verified.

7. Acceptance test — 0.5CP charge and discharge with pack-level voltage and temperature logged against the serial number.

8. Packing — the 2050kg cabinet is secured to a reinforced pallet, shock indicators fitted, and crated for freight.

Which Cluster, and How Many

Choose the model by your PCS voltage window first and your energy target second. A 750-900V DC bus points to the 241kWh cluster (672~864VDC); a 600-800V bus points to the 225kWh unit (604~806VDC). Forcing a voltage mismatch means derating the battery or the inverter, and both hurt the payback.

Then count clusters against the dispatch window: each 225kWh cluster delivers 150A standard into the bus, so the useful energy in a two-hour window is what the PCS converts, not the nameplate.

Be honest about the procurement shape. If your project has no PCS and no EMS yet, a bare cluster is the wrong starting point - an integrated cabinet or container from the same factory range will reach commissioning faster. The cluster is for buyers who already own the rest of the stack.

Questions to Put to a Cluster Quote

Ask for the voltage window, not just the nominal. A cluster quoted as '768V' can still be useless if your PCS clips at 850V and the pack charges to 864V.

Ask whether the comms register map ships with the unit or only after an NDA review - ours is in the documentation pack.

Ask how fire protection is staged: aerosol and perfluorohexanone are both present here; a single-agent quote changes your insurance file.

Ask whether the cycle claim states rate, temperature and retention - '8000 cycles' without conditions is not a specification.

Commercial terms: 25-35 working days for standard clusters, five-year warranty, MOQ one unit for prototype integration work.

Shipping a 2050kg Cluster

The cabinet measures 1095*1210*2120mm and weighs 2050kg on both variants, so it moves on a reinforced pallet with forklift pockets and lifting points for a crane where the site needs one.

With the battery installed, the shipment is UN3480 dangerous goods: we prepare the UN38.3 report and MSDS, and you should add roughly one week of DG booking lead time at origin.

Terms are FOB Ningbo or Shanghai with CIF on request. One cluster per truck compartment is the practical load for road freight; two fit a 20-foot container with bracing if the route allows.

Service and Capacity Commitment

Five-year warranty on packs, air conditioning, fire system and the cluster controller as one delivered unit.

Capacity retention is warranted at 80% under stated 0.5C cycling, benchmarked against the factory acceptance log.

Packs are swappable in the field: a weak pack is replaced in hours with the rest of the string untouched, and the BMS re-balances on restart.

Remote diagnostics over CAN/Eth/RS485 (4G optional) let our engineers read pack-level data and flag drift before it shows in the site energy reports.

Annual service covers filter cleaning, fire pressure checks, torque verification and a capacity run; spare packs ship within 5-7 working days.

Integration Mistakes We See Repeated

Wrong: wiring the cluster to a PCS whose DC window barely overlaps the battery range. Right: verify 604~806VDC or 672~864VDC sits inside the PCS window with margin at both ends.

Wrong: mixing 225kWh and 241kWh clusters on one bus. Right: parallel units must be the same model so nominal voltages coincide.

Wrong: leaving the DC bottom entry gland accessible to water run-off. Right: seal the gland at installation and keep the plinth area clear.

Wrong: assuming IP54 means outdoor exposure anywhere. Right: it tolerates dust and splashing, not standing water - keep the cluster out of flood-prone ground.

Wrong: skipping the comms map test before energising. Right: run a bench-level CAN/RS485 handshake with your EMS before the cluster is connected to the bus.

What Integrators Report

A system integrator in Dubai paired the 241kWh cluster with a 500kW PCS for a hotel project in early 2025. Their lead engineer said the CAN register map let them finish EMS mapping in an afternoon, and that the factory test report made the local authority's document review straightforward - though the DC cable tails were shorter than their standard practice, so they added a junction box.

An EPC in Cape Town standardized on the 225kWh cluster across three retail sites. Their procurement lead noted the identical 2050kg cabinet and common spare-parts list simplified site logistics, while their commissioning crew complained the air conditioner's service access panel sits on the side that faces the wall in their preferred layout.

A mining contractor in Medellin, Colombia runs two 241kWh clusters on one DC bus behind a diesel-hybrid system. Their control engineer confirmed the parallel configuration held matched SOC as advertised, and asked for a longer WiFi antenna option so the cluster diagnostics reached the control room without a cable.

Answers Integrators Ask Before Signing

Q: Is the PCS included?

A: No - this is the DC-side battery cluster. It hands off to your PCS/EMS over CAN, Ethernet or RS485 (4G optional).


Q: Which PCS voltages does it match?

A: The 225kWh cluster spans 604~806VDC; the 241kWh spans 672~864VDC. Check your PCS DC window against the range.

Q: Can I run two clusters in parallel?

A: Yes, same-model clusters on the same DC bus, matched nominal voltage, aggregated by the site EMS.

Q: What is the standard current?

A: 150A per cluster at a 0.5CP rate; the PCS defines the power, the cluster defines the energy.

Q: What is the round-trip efficiency?

A: Maximum 88% at 0.5C over one charge and one discharge, auxiliaries included.

Q: How long will the cells last?

A: Over 8000 cycles at 0.5C and 25°C with at least 80% retention; higher ambient temperatures shorten it.

Q: Does it work with a third-party EMS?

A: Yes - the register map is part of the documentation pack, so your engineer can integrate without a factory call.

Q: What is the lead time?

A: 25-35 working days for standard clusters, plus about a week of dangerous-goods booking at origin.


Send Inquiry
Contact Info

Talk Directly to Our EV Charger Factory

Get factory-direct pricing, custom solutions, and expert support.

- Fast Response – Reply within 24 hours.

- OEM/ODM – Flexible customization and sample orders.

- Certified Quality – CE, TÜV, CB, and CCC options.

- Custom Quotes – Tailored to your specifications.

- Technical Support – Expert help with OCPP, DLB, and system integration.

X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
RejectAccept