" "
Products
120kW Commercial DC EV Charger with Digital Display for Public Stations
  • 120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations
  • 120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations
  • 120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations
  • 120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations
  • 120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations
  • 120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations

120kW Commercial DC EV Charger with Digital Display for Public Stations

AMPPAL 120kW Commercial DC EV Charger with Digital Display for Public Stations is engineered for North American 480V commercial power environments. With AC480V±10%, 45-65Hz input, this fast charger delivers stable performance while keeping noise levels capped at 60dB for mixed-use neighbourhoods. It features a 32-inch 1080P digital display, CCS1 connector, IP54 protection, 95% peak efficiency, and a 2-year warranty. As a certified factory, AMPPAL supports OEM/ODM services for different public charging applications.

Built for the 480V Panel: a 120kW Charger for North American Commercial Sites

North American commercial buildings are wired for 480V three-phase, and a charger that ignores that fact creates transformer costs nobody budgets for. The AF-DC-120-Y-B-M-4-H takes AC480V±10% at 45-65Hz directly, so most US and Canadian retail, industrial, and mixed-use sites can feed it from the existing panel without adding a step-down transformer.

It also caps noise at 60dB — roughly 5dB below typical DC cabinets — which matters at property lines, apartment-adjacent lots, and commercial districts that run all night. The 32-inch 1920×1080 display on the fascia handles your media or brand content, but the electrical story is what makes this model different.

Peak efficiency sits at 95%, the enclosure is IP54, and the CCS1 output covers 0-250A. It is a 120kW machine that is easy to say yes to at the service entrance, and the display pays for part of the installation over time.

120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations

Why 480V Input and a 60 dB Ceiling Matter at the Property Line

No step-down transformer: the 480V service feeds the unit directly, saving cost, floor space, and the losses of an extra conversion stage.

45-65Hz wide-frequency input tolerates weaker utility grids and generator power during construction phases, which is a real advantage on sites with unstable supply.

A 60dB ceiling — about the level of a normal conversation — keeps neighbours and night-shift staff comfortable.

Fan speed follows load and temperature instead of running at full blast from plug-in, which trims both noise and wasted energy over a 24-hour cycle.

Thermal derating protects the electronics in 50°C heat while the 120kW rating holds honestly in normal conditions.

The 32-inch display still does its media job — ads, station info, or your brand loop — through the same remote content portal.

Technical Specifications

Factory specification of the AF-DC-120-Y-B-M-4-H exactly as shipped.

Parameter

Specification

Model

AF-DC-120-Y-B-M-4-H

Rated Output Power

120kW

Overall Dimensions (mm)

1800 × 750 × 690

Input Voltage

AC480V±10%, 45-65Hz

Digital Display

32" 1920×1080 display

Peak Efficiency

95%

Power Factor

≥0.99

Noise Level

≤60dB

CSS1 Current

0-250A

Operating Temperature

-25°C ~ +50°C

Compatible Connectors

CCS1 (Customizable)

Protection Grade

IP54

Warranty

2 Years Standard

Sites That Need Both Loud Visibility and Quiet Nights

Mixed-use developments: retail at street level with apartments above — the charger runs all night without triggering noise complaints.

US and Canadian retail chains: 480V panels are already on site, so the unit drops onto the existing service.

Office and hotel parking garages: 20–40 minute sessions at 120kW turn stalls over through the working day.

Municipal lots near residential blocks: the dimmed screen and 60dB ceiling keep the site neighbour-friendly even on overnight sessions.

Fleet depots on industrial 480V services: one panel feeds the chargers and the existing shop equipment.

Convention centres and event venues: the display carries sponsor messaging during shows, and 120kW turns cars around between sessions.

How the Machine Converts 480V to DC — Without the Hum

The input stage rectifies AC480V three-phase onto an intermediate DC bus, then high-frequency converters step the power down to the voltage the vehicle requests. Wide-bandgap switching modules are the reason the unit holds 95% peak efficiency at this input voltage, which is harder than it sounds — higher input voltages tighten the switching margins.

The noise story is about cooling, not conversion. Fans are temperature-controlled and run at partial speed most of the time; only sustained heavy loads push them toward full rpm. That is the practical difference between a 60dB unit and the 65dB cabinets common in this class.

OCPP 1.6/2.0 carries session data, remote diagnostics, and firmware updates, while the display runs its own content feed. Both systems report into one station record in your backend.

120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations

Testing That Backs the 60 dB Claim and the Electrical Safety Marks

Sound pressure is measured at 1 metre from the cabinet under full load and recorded in the unit test report, so the 60dB figure is verifiable, not a brochure guess.

CE and TUV type approval cover the complete unit; UL and CB electrical reports are available for export files.

96-hour salt-spray testing on the enclosure and the display bezel seals.

Insulation and surge tests on the AC480V input stage across the full 45-65Hz band.

A 48-hour full-load burn-in logs noise, temperature, and electrical readings against the serial number.

Modules are rated -30°C to +55°C; the complete unit is specified for -25°C to +50°C.

From Coil to Crate: Making a 480V-Ready Cabinet

Step 1. Steel coils are laser-cut and robot-welded on FANUC lines.

Step 2. TRUMPF press brakes form the panels; powder coat and cure follow.

Step 3. The 480V input stage — contactors and surge arrestors — is wired on the AC line with torque control.

Step 4. Rectifier modules and the display sub-assembly are fitted on the DC line.

Step 5. The cooling assembly, fans, ducts, and temperature sensors, is installed and sealed.

Step 6. Full-load testing at 120kW records efficiency, power factor, and noise per unit.

Step 7. A 48-hour burn-in cycles charging sessions and screen playback together.

Step 8. Final inspection and crating; the plant has shipped over one million units through 2024.

Matching the 120kW Display Unit to Your Service Entrance

Spec this unit when your site is in North America with a 480V commercial service, or in any market running 480V three-phase. 120kW is a practical middle class: a full charge for most passenger EVs in 25–45 minutes, without the feeder demands of 160kW-plus cabinets. It also gives you a second revenue stream through the screen without complicating the electrical install.

Do not buy it for a site with only 208V or 230/400V service. This input variant is fixed at 480V, and adding a transformer defeats the whole point — ask us for the 380V variant if that is your grid.

And if the site has bedrooms directly above the forecourt, budget realistically: even 60dB is audible indoors at night. Plan a sound barrier or a night power-cap schedule before the neighbours file the first complaint.

What AMPPAL Offers That Local Distributors Don't

Factory-direct pricing from Yueqing, with CE, TUV, UL, and CB certificates in the quotation package.

15–20 working days delivery after drawing approval; MOQ from one container.

OEM/ODM: your brand on the cabinet and on the display boot screen.

We operate 200+ stations ourselves, so engineering feedback from the field loops back into the design.

A 2-year warranty with spare panels and modules cross-shipped within 5 working days.

Packing and Shipping a 120kW Unit for a US Job Site

The cabinet ships upright in a steel-framed crate sized for the 1800 × 750 × 690 mm body. The display is capped with foam and plywood, and the CCS1 assembly rides in a padded inner box.

Crates have fork pockets and four lifting points; the crate plan goes out with the quotation so your freight forwarder can plan the truck from port to site. The unit travels upright at all times, which keeps the internal bus bars and the display seal intact.

Terms are FOB Ningbo or CIF to a US or Canadian port. Invoice, packing list, bill of lading, certificate of origin, and test reports are issued within 3 working days of loading.

Warranty, Spares, and Support After the Unit Lands

2-year standard warranty covering modules, controller, display, and cooling.

Spare power modules and panels in stock; cross-ship exchange within 5 working days.

Remote OCPP diagnostics for faults, firmware, and fan behaviour.

Commissioning support by video call for first-time installers.

A quarterly maintenance checklist covering filters, fans, and torque checks.

Installation Notes for 480V Sites and Mixed-Use Neighbourhoods

Wrong: feeding the unit from a 208V panel and expecting full power. Right: provide AC480V±10% three-phase at the service entrance.

Wrong: assuming the unit is 50Hz-only. Right: it accepts 45-65Hz, but confirm the local frequency on the nameplate before energising.

Wrong: placing the cabinet against a wall with the fans facing a corner. Right: keep the clearance shown in the installation manual so fan control works as designed.

Wrong: forcing fans to high speed after a hot day. Right: let the controller ramp them down; forced speed only wastes power and adds noise.

Wrong: ignoring phase balance on a shared service. Right: have an electrician verify loading across the three phases before commissioning.

Feedback from Operators Who Care About Decibels

A contractor in Houston, Texas, USA installed two units at a retail plaza in early 2025. The property manager's main worry was noise from the apartment block next door; after three months the only logged complaint was screen brightness at 11 p.m., which the night schedule fixed the same week. The charging side has not needed a service call since.

A shopping-centre owner in Toronto, Canada feeds the units from the mall's 480V panel and saved the transformer cost entirely. The electrician confirmed phase loading at commissioning; their only gripe is that the display template took a while to learn, while the charging side has run clean for eight months.

A developer in Seattle, USA placed a unit in a mixed-use garage where the retail tenant wanted the ad screen. The tenant reports the 60dB ceiling held up in their noise study and now plans units for two more properties; the small complaint is that the CCS1 cable feels stiffer in winter cold than expected, which is a cable jacket matter, not a charger fault.

120kW Commercial DC EV Charger with Digital Display for Public Stations120kW Commercial DC EV Charger with Digital Display for Public Stations

FAQ: 480V Input, Noise Limits, and 120kW Output

Q: Can this unit run on 380V European power?

A: No, this variant is fixed at AC480V±10%. Ask for the 380V version if your grid is 230/400V.

Q: How loud is 60dB really?

A: About the level of a normal conversation, measured at 1 metre from the cabinet under full load.

Q: Does the noise get worse at night?

A: Only if load and heat demand it; fan speed follows temperature, not the clock.

Q: What size feeder does a 120kW unit need at 480V?

A: Around 150A per phase at full load before margin; your engineer should size the breaker with headroom for inrush and future additions.

Q: Does the 32-inch screen add to the noise?

A: No, the panel is passively cooled and completely silent at any hour.

Q: Is a transformer required?

A: Not if your site has 480V three-phase; the unit is designed to connect directly to such a service.

Q: What does the warranty cover?

A: 2 years standard, covering the power stage, the display, and the cooling system.

Q: Can we install it in Canada?

A: Yes, 480V is standard there, and the certification documents ship with the unit.


Send Inquiry
Contact Info

Talk Directly to Our EV Charger Factory

Get factory-direct pricing, custom solutions, and expert support.

- Fast Response – Reply within 24 hours.

- OEM/ODM – Flexible customization and sample orders.

- Certified Quality – CE, TÜV, CB, and CCC options.

- Custom Quotes – Tailored to your specifications.

- Technical Support – Expert help with OCPP, DLB, and system integration.

X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
RejectAccept