" "
Products
60kW Commercial DC Fast EV Charging Station for Highway Services
  • 60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services
  • 60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services
  • 60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services
  • 60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services
  • 60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services
  • 60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services
  • 60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services
  • 60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services

60kW Commercial DC Fast EV Charging Station for Highway Services

AMPPAL 60kW Commercial DC Fast EV Charging Station for Highway Services (AF-DC-60-Y-B-O-4-H) is a 60kW integrated DC fast charger built around the question operators ask first - how will drivers pay? Card terminal, QR, RFID and Plug & Charge on one cabinet, OCPP 1.6j transaction data to your backend. 200-1000VDC, IP54. Factory-direct from Zhejiang, China.

What This 60kW Charger Is, and Why Payment Decides Its ROI

A charging station only earns money when the session ends with a payment that clears - and that is the part most 60kW spec sheets never talk about. AMPPAL AF-DC-60-Y-B-O-4-H is a floor-standing integrated DC fast charger, 1620 x 750 x 560 mm, with four ways for a driver to pay: a credit/debit card terminal, QR scanning, RFID cards, and Plug & Charge.

Under the payment layer sits a 200-1000VDC power stage with constant power from 300 to 1000V, so 400V and 800V cars both charge near their full rate. The 7-inch touch screen runs the session; OCPP 1.6j over Ethernet, 4G or WiFi carries every transaction to your billing software.

Why does payment matter so much at 60kW? Because these stations sit at convenience stores, hotel lots and small commercial sites, where the driver is not a captive fleet user - if a tourist cannot pay with the method in their wallet, you lose the session and the revenue.

60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services

Four Ways a Driver Can Pay, and Why That Wins Sites

Card terminal: accept the standard payment terminals used across EU networks - swap in the model your acquirer specifies, and card mandates in Germany or France are satisfied.

QR on the 7" screen: drivers scan with their local app - Alipay-style wallets in the Gulf, GCash-style apps in Southeast Asia - and the gateway you choose settles the rest.

RFID: a fleet manager hands out cards to drivers and gets one monthly bill instead of reimbursing app payments one by one.

Plug & Charge (ISO 15118): compatible EVs authenticate automatically when plugged, no screen touching at all - the method North American networks are pushing hardest.

OCPP 1.6j settlement: Authorize, StartTransaction, StopTransaction and MeterValues flow to your CPO backend, so revenue reconciles without hand-exporting CSV.

95% peak efficiency and IP54 enclosure keep the machine earning: less heat loss, less dust ingress, fewer service trips.

60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services

Technical Specifications

Parameter

Specification

Model

AF-DC-60-Y-B-O-4-H

Rated Output Power

60kW

Overall Dimensions (mm)

1620 × 750 × 560

Input Voltage

AC380V±15%

Output Voltage Range

200-1000VDC (Constant power 300-1000V)

HMI

7" touch screen

User Authentication

RFID/APP/Plug & Charge

Payment Methods

Credit card/QR/Payment terminal

Connectivity

OCPP 1.6j, Ethernet/4G/WiFi

Power Factor

≥0.99

THD

≤5%

Peak Efficiency

95%

Protection Grade

IP54

Noise Level

≤65dB

Safety Functions

13 functions including insulation monitoring, polarity reverse, lightning protection

Compatible Connectors

CCS1/CHAdeMO/CCS2/GB/T/NACS

Operating Temperature

-25°C ~ +50°C

Warranty

2 Years Standard

Where Card-First and QR-First Markets Deploy This Unit

Fuel stations and convenience stores in Germany, France and Croatia, where regulators expect a working card reader next to the plug.

Malls and hotel car parks in the UAE and Saudi Arabia, where QR payment habits dominate and the 1620 mm cabinet fits under a standard canopy.

Resort parking in Thailand, Vietnam and Indonesia, serving tourists who carry a different app on every trip.

Light fleet depots - delivery vans and taxis - where managers issue RFID cards instead of chasing driver expense claims.

Municipal lots and supermarket roofs where one machine must satisfy future Plug & Charge cars without a hardware swap.

60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services

The Payment-to-Backend Flow, Step by Step

The session flow: driver plugs in, authenticates with RFID card, app scan, card tap or Plug & Charge handshake, then the charger runs an OCPP Authorize call against your backend. If the reply is yes, power ramps to the vehicle's requested voltage inside the 300-1000V constant power window, and MeterValues are pushed until StopTransaction closes the record.

Settlement stays clean because the charger never prices alone - your backend does. You set tariffs per connector, per time window or per user group, and the unit simply reports measured kWh.

No software of your own? It pairs with mainstream OCPP platforms out of the box, and our engineers walk your IT team through the fields during commissioning.

Certificates on File and What We Test Per Batch

Certificates: CE, CB, TUV, UL and CCC - copies tied to this model on request.

Before shipping, every unit runs 48 hours at full load with module and connector temperatures recorded.

Enclosure samples sit in a 96-hour salt-spray chamber and pass IP54 checks; the operating band is -25C to +50C.

Compliance with EN IEC 61851-1:2019 and EN IEC 61851-23:2014 wraps the 13 safety functions.

Metering is calibration-checked on a random sample each batch, so billed kWh match measured kWh.

Inside the Build: 8 Steps from Coil to Crate

Step 1: CNC punching, bending and laser cutting of the 1.5mm steel enclosure on lines shared with FANUC robots.

Step 2: Powder coating and curing; a salt-spray sample is pulled from the same batch for verification.

Step 3: AC input stage and DC power modules built on separate lines - the two never mix.

Step 4: Incoming inspection on SiC modules, connectors and the card-reader housing.

Step 5: Wiring with torque-controlled terminals, then a visual QC pass on every joint.

Step 6: 48-hour burn-in at 40C ambient logging output, efficiency and comms stability.

Step 7: Firmware flash, OCPP 1.6j test against our server, and functional tests on all four payment paths.

Step 8: Packing, palletizing and a pre-shipment photo report.

Sizing Guide: When This 60kW Cabinet Earns Its Keep

Pick the AF-DC-60-Y-B-O-4-H when your site expects mostly 400V passenger EVs, sessions of 30-60 minutes are acceptable, and your main headache is collecting money from walk-in drivers. Retail, hospitality and small commercial sites fit this profile, and four payment methods remove the most common reason a session dies.

This product is not for you if your site runs 800V taxis that must turn around in under 20 minutes - a 120kW or 160kW unit earns more per bay there. It is also the wrong pick for a purely app-only network that will never use the terminal slot.

Still deciding? Tell us the country, the vehicle mix and your acquirer, and we will recommend the configuration - including whether to ship the card reader pre-installed or leave the slot for your terminal.

Why Operators Order from Us Rather Than a Reseller

You negotiate with the manufacturer in Yueqing, not with a middleman quoting someone else's price list.

OEM/ODM: your logo, your color, your payment app preconfigured - hardware, software and branding from one plant.

Standard units ship in 15-20 working days; OEM batches add 7-10 days for artwork and testing.

Trial orders from 1 unit for new markets; container-level pricing once the model proves itself.

Spares move by DHL/FedEx under the 2-year warranty, and remote diagnostics ride the same OCPP link your billing uses.

60kW Commercial DC Fast EV Charging Station for Highway Services60kW Commercial DC Fast EV Charging Station for Highway Services

Packing, Loading and the Paperwork That Goes With It

Each charger travels in a plywood case with foam cradles around the screen and the card-reader area. Cabinet weight is roughly 300 kg; the crate adds 60-80 kg, and a 40HQ takes 10-14 crates depending on layout.

We ship FOB Ningbo or Shanghai by default; CIF, CFR and DDP can be arranged. A pallet diagram goes to your forwarder before packing.

The crate holds the commercial invoice, packing list, certificate of origin, CE/TUV copies and the OCPP integration guide.

Warranty, Spares and the Fine Print You Should Read

Two years on the unit. Note the payment terminal is covered too - card readers are the part integrators most often assume is excluded.

Replacement parts go out by DHL or FedEx within two days of a confirmed claim; Europe typically sees them in 3-5 working days.

Firmware and OCPP parameters update remotely over the network link; most fixes need no site visit.

Video commissioning for first installs: wiring, grounding and backend pairing checked live with your technician.

Yearly maintenance: clean air filters twice a year, retorque AC input terminals once a year, keep the QR area free of stickers.

Field Notes: Wrong vs Right at the Machine

Wrong: Mounting the cabinet so the card terminal faces direct afternoon sun, then blaming the reader. Right: place it under a canopy; screen and terminal stay readable and cool.

Wrong: Sharing the site transformer with welding machines and compressors. Right: give the charger its own breaker and keep input inside AC380V +-15%, which the wide-range design tolerates.

Wrong: Leaving a sticker over the QR code. Right: check the scan area weekly - a dead QR kills more sessions than a broken cable.

Wrong: Pulling the network plug because one firmware update failed. Right: call us first; most update issues roll back in minutes over the OCPP link.

Wrong: Assuming Plug & Charge works on every EV. Right: it needs an ISO 15118-capable vehicle and an enabled backend; RFID and card remain the universal fallback.

Three Buyers, Three Markets, Real Feedback

A fuel retailer in Croatia replaced three app-only chargers with AF-DC-60-Y-B-O-4-H units at two highway forecourts in March 2025. Card payments jumped from zero to 40% of sessions within a month, and their accountant pulls settlement reports from the backend instead of matching spreadsheets. Their complaint: the 7" screen collects fingerprints fast in summer.

A hotel group in Dubai installed eight units across two properties, relying mostly on QR payment. The front desk found the RFID cards useful for staff vehicles. The maintenance supervisor notes the cabinet is heavy to reposition - plan the location before the concrete is poured.

A taxi cooperative in Malaysia runs six units at their depot with RFID fleet cards. Average session is 42 minutes on 400V taxis, and revenue reconciliation went from weekly to real-time. The gripe: drivers found the end-of-session beep too loud at night, which the operator lowered from the backend.

FAQ

Q: Can this charger take card payments in every European country?

A: The cabinet accepts the standard payment terminals used across EU networks; compliance with local rules (e.g. Germany's calibration law) depends on the terminal and acquirer you pair with it. We help you pick a compatible model.

Q: Does Plug & Charge work out of the box?

A: The hardware supports ISO 15118, but Plug & Charge also needs an enabled contract certificate on your backend and a compatible vehicle. We test the handshake on our lab charger before shipment.

Q: How do I connect this to my existing OCPP platform?

A: Set the server URL and credentials in the 7" screen settings or via our web tool; the charger supports OCPP 1.6j over Ethernet, 4G or WiFi. Most platforms recognize it within minutes.

Q: Can drivers pay with local QR apps like STC Pay or GCash?

A: Yes - QR payments are processed by your payment gateway; the charger displays the QR code your provider generates. We configure the gateway endpoint with your team.

Q: What if a session fails at the payment step?

A: The charger logs the auth attempt and failure code. Most failures are an expired RFID card or a badly photographed QR - both visible in the transaction log.

Q: Is 60kW enough for a busy location?

A: For retail and hotel sites with 30-60 minute sessions, yes. If you expect peak queues above 8-10 cars per day per bay, consider a higher-power model or a second unit.

Q: Do you offer this model with custom colors or logos?

A: Yes, OEM branding is standard - powder coat color, logo and app name can all be customized; lead time adds about 7-10 working days.

Q: What is the minimum order for factory pricing?

A: Trial orders start at 1 unit at standard pricing; container-quantity orders (10+ units) unlock wholesale pricing. Ask for the current price list.


Send Inquiry
Contact Info

Talk Directly to Our EV Charger Factory

Get factory-direct pricing, custom solutions, and expert support.

- Fast Response – Reply within 24 hours.

- OEM/ODM – Flexible customization and sample orders.

- Certified Quality – CE, TÜV, CB, and CCC options.

- Custom Quotes – Tailored to your specifications.

- Technical Support – Expert help with OCPP, DLB, and system integration.

X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
RejectAccept