Products
14kW AC EV Charger for Hotels and Office Buildings
  • 14kW AC EV Charger for Hotels and Office Buildings14kW AC EV Charger for Hotels and Office Buildings
  • 14kW AC EV Charger for Hotels and Office Buildings14kW AC EV Charger for Hotels and Office Buildings
  • 14kW AC EV Charger for Hotels and Office Buildings14kW AC EV Charger for Hotels and Office Buildings
  • 14kW AC EV Charger for Hotels and Office Buildings14kW AC EV Charger for Hotels and Office Buildings
  • 14kW AC EV Charger for Hotels and Office Buildings14kW AC EV Charger for Hotels and Office Buildings
  • 14kW AC EV Charger for Hotels and Office Buildings14kW AC EV Charger for Hotels and Office Buildings
  • 14kW AC EV Charger for Hotels and Office Buildings14kW AC EV Charger for Hotels and Office Buildings

14kW AC EV Charger for Hotels and Office Buildings

AMPPAL 14kW AC EV Charger for Hotels and Office Buildings is a dual-gun AC charging station that packs two Type 2 sockets into a tower only 150mm deep. Where a 240mm pedestal blocks a footpath, the 300 x 150 x 1400mm SlimTower stands between bays without obstructing traffic. 380VAC three-phase input, 5-inch color touch screen, OCPP 1.6J, Ethernet/4G/WiFi, IP54, CE. Made in our Zhejiang plant, which had shipped over one million units by 2024. OEM/ODM welcome.

What a 150mm Tower Changes on Your Site

Take any AC charging pedestal you have seen on a European street and it is usually about 240mm deep. This one is 150mm. That 90mm sounds trivial until you stand between two parking bays and try to keep the aisle clear.

The 14kW AC EV Charger for Hotels and Office Buildings (AF-AC-014-Y-A-0-4-JA-P) is a 300 x 150 x 1400mm column carrying two Type 2 guns, rated 16A+16A on a 380VAC three-phase feed, with a 5-inch color touch screen up top. The envelope exists to solve one problem: where does a charger go when no wall and no wide island is available?

Operators use it on the strip between two head-in bays, along sidewalk edges where a wider cabinet would fail approval, and inside garages where columns eat every spare meter. The charging itself is standard AC; the footprint is the feature.

14kW AC EV Charger for Hotels & Office Buildings14kW AC EV Charger for Hotels & Office Buildings

Five Payoffs of a Column Half as Thick

150mm depth clears wheelchair routes and door swings that a 240mm pedestal would block; this is the dimension that decides whether a site survey passes.

Two Type 2 sockets (16A+16A) let two cars charge from one feed point, roughly doubling the throughput of a single-gun pole.

The tower stands 1400mm tall with the 5-inch display at eye level in a busy lot.

IP54 protection and a -20°C to +50°C working range cover street weather without a shelter or canopy.

OCPP 1.6J with Ethernet, 4G, and WiFi joins an existing back office without new software.

Every unit is CE certified and carries a 2-year factory warranty, with 15-20 working days lead time from our Zhejiang plant.

Technical Specifications

Parameter

Specification

Model

AF-AC-014-Y-A-0-4-JA-P

Rated Power

14kW

Input Voltage

380VAC ±15%

Rated Current

16A+16A

Dimensions

300 × 150 × 1400 mm

User Interface

5" Color Touch Screen

Network Protocol

OCPP 1.6J

Communication

Ethernet, 4G, WiFi

Protection Grade

IP54

Operating Temp

-20°C to +50°C

Certification

CE Compliance

Warranty

2 Years

Sites Where Every Centimeter Is Billed

On-street bays in old European towns where the sidewalk is too narrow for a 240mm cabinet; the 150mm tower hugs the kerb line.

Head-in parking rows: one tower on the shared strip serves two opposing rows.

Multi-storey car parks with tight ramp turns; the profile keeps sight lines open for drivers and cameras.

Hotel and office forecourts where the landscape architect refuses a bulky pedestal beside the entrance.

Temporary event sites: one M12 anchor base, two guns, and a 380V feed can be commissioned in a day.

Dealership forecourts that top up demo EVs overnight without giving up showroom parking.

14kW AC EV Charger for Hotels & Office Buildings14kW AC EV Charger for Hotels & Office Buildings

How the Tower Serves Two Vehicles from One Column

A 380VAC +/-15% three-phase feed enters through the base plate and lands on a DIN-rail section inside the column, where the station distributes it to the two sockets. Each gun is rated 16A per phase; firmware caps total output at the 14kW nameplate and shares that headroom between the two cars.

Plug in the first car and it draws the whole budget. Start a second session and the tower rebalances current between both sockets without interrupting the first; the screen shows each session's kW and kWh in real time.

The touch screen runs a plug-and-charge flow, while OCPP 1.6J carries every transaction record to your server over Ethernet, 4G, or WiFi. If the network drops, the session continues and records upload later.

Certification and the Tests Behind It

CE compliance per the Low Voltage and EMC directives, reverified before each production batch ships.

100% of units pass hi-pot dielectric testing and ground continuity checks on the final line.

Thermal cycling from -30°C to +70°C per IEC 60068 on sampled units, plus a 96-hour salt spray test for coastal installations.

48-hour continuous full-load burn-in with live monitoring of current, temperature, and communication stability.

Components are RoHS and REACH compliant, and the factory runs an ISO 9001:2015 quality management system.

Incoming inspection covers every connector batch; a loose Type 2 socket is the most common field failure we see in AC towers.

From Flat Steel to a 1.4-Metre Column: Eight Steps

Laser cutting: sheets are cut on CNC lasers to the exact tower profile, tolerances held to 0.1mm.

Bending and forming: a CNC press brake folds the column shell and spot welds lock the seam.

Robotic welding on FANUC arms joins the base bracket and cable entry gland, the same process used on our DC line.

Surface treatment: a three-stage cleaning and finishing line protects the shell before assembly.

Pre-assembly: the DIN rail, contactors, residual current device, and metering module are fitted and torqued to spec.

Electronics: display, comms board, and power board are mounted and connected.

Firmware load and OCPP conformance check: each unit is registered and paired with a test server before boxing.

Final QC and packing: hi-pot test, visual inspection, and carton packing close the line; standard orders leave in 15-20 working days.

Is 14kW the Right Fit for Your Footprint?

The 14kW tower earns its keep where the constraint is physical. If your site is a wide-open lot with a concrete island ready for a standard pedestal, buy the cheaper 240mm cabinet; the slim profile buys you nothing.

It is also the wrong tool when cars stay eight hours or more. Overnight fleet parking is better served by 3.5-7kW wall boxes at a fraction of the price, because 14kW only pays back when vehicles cycle in and out during the day.

Choose it when you can count the centimeters: a narrow median strip, a kerbside row with a strict setback rule, or a garage where a wider cabinet would cost a parking spot. If two cars at roughly 7kW each matches your dwell time, this is the most space-efficient way to deliver it.

AMPPAL vs the 240mm Standard Pedestal

Footprint: 150mm versus about 240mm depth means the tower passes site surveys that reject the pedestal.

One feed, two cars: a single three-phase circuit serves both guns, instead of two separate installations.

Test evidence: CE, 100% hi-pot, 96-hour salt spray, and 48-hour burn-in are documented per batch, not just claimed in a brochure.

Buying terms: standard models from MOQ 1 unit, 15-20 working days lead time, 2-year warranty, spare parts via DHL/FedEx.

Customization: logo, startup screen, and cable branding can be changed; we have shipped export programs to 40+ countries including UAE, Saudi Arabia, Kazakhstan, Germany, and Mexico.

Packing and Shipping: Getting Columns to the Site

Each tower ships fully assembled in one export carton of approximately 350 x 220 x 1460mm with foam corner blocks; gross weight is about 45kg including the anchor kit and cable glands.

Cartons go four per pallet, shrink-wrapped with edge protectors; a 40-foot container holds roughly 60 towers palletized, or up to 80 floor-loaded.

Standard terms are FOB Ningbo or Shanghai, or EXW plant. Every shipment includes the commercial invoice, packing list, bill of lading, certificate of origin, and CE declaration of conformity; sea freight to Rotterdam or Jebel Ali typically runs 30-40 days.

Support That Respects Your Installation Timeline

2-year warranty on manufacturing defects, counting from shipment rather than commissioning, which installers tell us simplifies claims.

24-hour response on technical tickets, with video diagnostics so your electrician can be walked through a fix the same day.

Spare parts by DHL/FedEx from our central warehouse; fast-moving items such as touch screens and cable glands leave within 2 working days.

Paper-first RMA: send photos and the unit serial, and we decide between replacement or repair before you ship anything back.

For multi-site rollouts we suggest one maintenance kit per 20 towers held in your stock, so field swaps never wait on customs.

On-Site Handling: Wrong vs Right

Wrong: mounting the tower so the cable loops toward the traffic aisle. Right: orient the column so both cables exit away from the driving lane.

Wrong: feeding the tower from an undersized circuit because it is only AC. Right: size the feed for both guns together; a 32A three-phase breaker with 6mm2 conductors is a safe starting point, then verify against local code.

Wrong: running the Ethernet cable in the same conduit as the power cable. Right: separate ducts, at least 30cm apart, to protect the network link from interference.

Wrong: covering the touch screen with stickers or signage. Right: keep the display face clear; the 5-inch screen is the operator's only local interface.

Wrong: assuming the warranty covers vandalism. Right: report damage with photos and the serial number immediately; the 2-year warranty covers manufacturing defects, so the faster you document it, the faster we act.

What Site Managers Report After a Season

A parking operator in Dubai ran 12 of these towers along a kerbside row the municipality had ruled too narrow for standard pedestals. After eight months of 45°C summers, one touch screen developed a flicker, which we replaced under warranty within a week. His summary: the column is thin, but it has not bent, wobbled, or overheated.

A German hotel group standardized on the tower for its courtyard parking after the architect rejected a wider cabinet. Their one complaint: the 4G antenna drops to a single bar inside the courtyard, so they now order the WiFi/Ethernet version and cable it to the building switch.

A Saudi contractor bought a first batch of 20 for a mixed-use development. Anchor installs took his electricians two hours per tower on day one and under an hour after seeing the drilling template; they have since ordered three more batches.

14kW AC EV Charger for Hotels & Office Buildings14kW AC EV Charger for Hotels & Office Buildings

Frequently Asked Questions

Q: Can two cars really charge at the same time on the 14kW tower?

A: Yes, both sockets are live and the station shares the 14kW budget between them; a single car gets the full budget when alone.

Q: What clearance does the tower need from a kerb or wall?

A: Keep about 600mm of working space in front of the sockets; roughly 200mm sideways is enough for the cable loop.

Q: Does the slim tower need a concrete foundation?

A: An M12 anchor base on a 300 x 300mm concrete pad is standard; on asphalt we supply a surface-mount bracket.

Q: Which connector does the station ship with?

A: Two Type 2 sockets with 4.5m cables as standard; this AC model does not offer CCS.

Q: Can the tower run on single-phase power?

A: No, it requires 380VAC three-phase; for single-phase sites look at our 3.5-7kW wall-mounted AC stations.

Q: How does billing work without a payment terminal?

A: OCPP 1.6J hands tariffs and remote start/stop to your back office or roaming platform, while the screen shows session data locally.

Q: What is the lead time for a container order?

A: 15-20 working days for standard models after order confirmation and deposit.

Q: Is the screen readable in direct sunlight?

A: It is a 5-inch color LCD with an outdoor brightness setting; in harsh midday sun the shade hood we offer as an option helps.


Send Inquiry
Contact Info

Talk Directly to Our EV Charger Factory

Get factory-direct pricing, custom solutions, and expert support.

- Fast Response – Reply within 24 hours.

- OEM/ODM – Flexible customization and sample orders.

- Certified Quality – CE, TÜV, CB, and CCC options.

- Custom Quotes – Tailored to your specifications.